Saturday, March 22, 2008

March update

Things have been moving fast at the new house the past 3 weeks. we now have all the interior walls drywalled and textured. The insulation was sprayed and the house was caulked and sealed. The brick and stone is about half the way done. Take a look at the pictures on the SteveNCindyHome yahoo group: http://groups.yahoo.com/group/SteveNCindyHome/

We spent the past two days driving all over the DFW area from north Fort Worth to the south side of the metro-plex to Richardson to the east and Denton to the north buying 920 square feet of ivory travertine tile. Home Depot had a clearance on 18 inch ivory travertine for $1.99 per sq ft. It normally is $5 to $8 per sq foot. We got 700 at one store then 9, 100 and 111 at another.

We are looking at hard wood flooring and I believe that we are going to use 3/8 inch solid pre-finished Brazilian cherry or mesquite. We only need 500 sq ft of that. We are getting the cabinets installed next week. They are being built right now. We have picked the granite for the kitchen and to downstairs baths plus the upstairs wet bar. We are using new venetian gold in the kitchen and tan brown in the other areas. We also have the kitchen back splash picked out and are now working on the master bath and Nanny and Poppy bath. We are close on those.

We have also settled on the plumbing fixtures and have the order ready for those. We have to pick the lights but think we know what we want there except for the ceiling fans. We will probably just look for fans on sale.

So, all is moving along well.

No comments: